|

|
|
*Base : 12 *Shaft(400mm) : 11 *Shaft(300mm) : 10 *Rail(36000mm) : 1 *Arm : 82 *Ball : 5 *Giant slalom unit : 1 *Gearbox : 1 *Elevator : 1 *Rail support : 80 *Seesaw parts : 2 *Divergence parts : 2 *Manual : 1 *Battery : Ax1(optional) *Size of package: 420x320x75mm |
|
Giant slalom gimmick of new mechanism. |
 |
It is a delivery kipper in the saucer of a course that half rotates when the ball that has flowed is received and is away as for the ball . It has half rotated afterwards and it returns to former position.
The giant slalom done in a relaxed manner is an interior and high new gimmick that produces settled atmosphere. |
 |
 |
|
Start unit of new mechanism |
 |
It is a new gimmick that pushes the flowing ball out one by one. It moves so that the ball may flow to the giant slalom unit well. |
|
Four pile loop . The rotation of power is achieved by multiloop
|
 |
The volume twice a double loop is achieved by four pile loop.
The speed feeling where the ball that has dropped from a high position passes at high speed is great power.
Moreover, the achievement feeling when four pile loop is completed is one of the charms of this commodity. |
|
Elevator |
The seesaw gimmick . It is appearance of solidity in the course.
|
|
|
|
|
The electric elevator with 40cm or more height is newly arranged. Function of "SPACEWARP3500" . Divergence parts that divide seesaw parts and balls right and left. It is "SPACEWARP10000" that the gimmick that has appeared up to now is also all full. |
|
The divergence parts. The course with the divergence point that extends doubly is achieved.
|
|
|
Each gimmick can lay out to all places of the course and expands the extension as play to its maximum. |
|
Parts & Manual |
|
|
|